All Industries

renewable energy

Black Hills Power Project >

Walsenburg, CO — 16 vestas V100 turbines, 28.8 MW – total, COD date of 9/1/12

Broken Bow Wind Project >

Broken Bow, NE — 50 – 1.6MW GE turbines (80MW.)

Buffalo Ridge Wind Farm - 50MW >

White, SD — Services Provided Include: Roads and Tower Erection

Buffalo Ridge Wind Farm, Phase II - 210MW >

White, SD — Services Provided Include: BOP Contractor (Roads, Foundations, Erection and Tower Wiring)

Burleigh County Wind - 50MW >

Wilton, ND — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Cedar Hills and Diamond Willow Phase II Wind Farms - 30MW >

Rhame ND, Baker MT — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, Electrical and Tower Wiring)

Cedro Hill Wind Farm - 150MW >

Laredo, TX — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, O&M Building, Electrical and Tower Wiring)

Charles City Wind, 75MW >

Charles City, IA — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Erection)

Cimarron II Wind Farm - 131MW >

Cimarron, KS — Scope / Balance of Plant: Roads, Foundations, Collection System, Substation, Switchyard, Turbine Erection, Tower Wiring, and Operations & Maintenance Building

Crofton Bluffs Wind Project >

Crofton, NE — 20 – 1.8MW Vestas V90 turbines and 2 – 3.0MW Vestas V90 turbines (42MW.)

Crow Lake Wind Farm - 162MW >

Crow Lake, SD — 108 GE xle 1.5MW Turbines Services Provided Include: BOP Contractor

Douglas County School District Solar Project - 3030kW >

Highland Ranch, CO — Power Partners MasTec, LLC started working on the 3020kW Douglas County School District solar project in January of 2011.

Endeavor Gearbox Replacement >

Harris, IA — Services Provided Include: Gearbox Replcement, Erection

Endeavor Wind, Phase II - 50MW >

Harris, IA — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Goat Mountain Wind, Phases I & II - 150MW >

Robert Lee — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Jeffers Wind - 50MW >

Jeffers, MN — Services Provided Include: Tower and Turbine Erection

Kit Carson Wind Farm - 51MW >

Burlington, CO — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, O&M Building, Electrical and Tower Wiring)

Langdon Wind, Phase II - 40MW >

Langdon, ND — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Los Vientos 1A & 1B Wind Projects >

Willacy & Cameron Counties, Texas — The Los Vientos 1A and 1B wind projects are located in the Rio Grande Valley near Harlingen, Texas

Marengo Wind, Phases I & II - 217MW >

Dayton, WI — Services Provided Include: Tower and Turbine Erection

NoTrees Wind, Phases 1a &1b - 150MW >

Odessa, TX — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Oliver County Wind, Phases 1 & 2 - 98MW >

Center, ND — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Red Mesa Wind - 102MW >

Seboyeta, NM — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, O&M Building, Electrical and Tower Wiring)

Rugby Wind Farm >

Rugby, ND — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, O&M Building, Electrical and Tower Wiring)

Salisbury Solar Project - 5.7MW/dc >

Salisbury, MA — Completed in July of 2012, this project consists of 5.7MW/dc on 28 acres in Salisbury, MA.

Santa Isabel - 101.2MW >

Santa Isabel, Puerto Rico — MasTec Renewables Puerto Rico was selected by Pattern Energy to provide BOP construction services to build the 101.2MW wind farm.

Taloga Wind Farm - 129.6MW >

Putnam, OK — 54 Mitsubishi MWT95 2.4MW Turbines

Tharaldson Ethanol >

Casselton, ND — Services Provided Include: General Contractor – Site Work - Concrete – Structural Steel – Mechanical Equipment and Piping Installation

Three Buttes Wind - 100MW >

Glenrock, WY — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, O&M Building, Electrical and Tower Wiring)

Top of Iowa Wind, Phase II - 80MW >

Worth County, IA — Services Provided Include: Roads, Foundations, and Electrical Collection

Top of Iowa Wind, Phase III - 30MW >

Kensett, IA — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Erection)

Top of the World Wind Farm, Phases A & B - 200MW >

Glenrock, WY — Services Provided Include: BOP Contractor (Roads, Foundations, Erection, O&M Building and Electrical)

Wessington Springs Wind - 51MW >

Wessington Springs, SD — Services Provided Include: BOP Contractor (Roads, Foundations, Electrical Collection, Substations, Erection, O&M Building and Tower Wiring)

Willows Solar Project - 380kW >

Willows, CA — This 380kW solar project was started at the end of February 2011 in Willows, California.

power

Recovered Energy Generation Unit >

Manning, ND — Services Provided Include: General Contractor – Process Piping – Mechanical – Structural – Equipment Setting – Heavy Lift

Recovered Energy Generation Unit >

Zeeland, ND — Services Provided Include: General Contractor – Process Piping – Mechanical – Structural – Equipment Setting – Heavy Lift

Recovered Energy Generation Unit >

Glen Ullin, ND — Services Provided Include: General Contractor – Sitework – Foundations – Process Piping – Mechanical – Structural – Equipment Setting – Heavy Lift

Spiritwood Station, Combined Heat & Power (CHP) Plant >

Spiritwood, ND — Services Provided Include: Site Work – Concrete

oil / gas / chemical

Natural Gas Underground Storage Facility >

Near Peetz, CO — Early Civil & Injection Phase

heavy / civil

Concrete Dam Spillway >

Embden, ND — Services Provided Include: Excavation - Concrete Spillway

Industrial Park Lift Station >

Moorhead, MN — Services Provided Include: Earthwork – Underground Piping – Electrical – City Streets

Railroad Underpass >

Fargo, ND — Services Provided Include: 1000' long X 8' high Retaining Wall – Removal of 80 ton Steel Train Bridge

USACE Floodwall >

Fargo, ND — Services Provided Include: Construction of 1100 lf Concrete Floodwall and Lift Station

industrial agriculture

American Crystal Sugar Co. (ACS) – Drayton, North Dakota >

Drayton, ND — Services Provided Include: Factory Expansion Phase I - Pulp Dryer Internals - Rock Catcher Installation

American Crystal Sugar Co. (ACS) – East Grand Forks, Minnesota >

East Grand Forks, MN — Services Provided Include: Pulp Press Installation - Beet Washer Installation - Rock Catcher Installation

Sidney Sugars >

Sidney, MT — Services Provided Include: Batch Pan Installation

US Sugar Corporation >

Clewiston, FL — Services Provided Include: Refinery Expansion - Packaging Building