Red Mesa Wind - 102MW

Wanzek Construction broke ground in May 2010 as the Red Mesa Wind Farm BOP Contractor erecting 64 GE 1.6MW turbines. Wanzek is handling all civil work, foundations, erection, overhead / underground collection systems, and substation O&M Building.
 
Red Mesa Wind Farm completed in December 2010.