Briscoe

Briscoe Masthead_121322
sprite-7

Statistical or Overview Information

Start Date: February 2015

Completion Date: October 2015

Wanzek was the EPC contractor for Briscoe, a 150 MW project consisting of 81 GE 1.85 MW turbines. This project included a 34.5:115 kV step-up substation with a single transformer bay, six open air collection feeder circuits and a single step 34.5 kV 15MVAR capacitor bank.

Project Scope:
  • Civil
  • Control terminations and testing
  • Engineering
  • EPC services
  • Equipment installation
  • Foundations
  • O&M building
  • Procurement
  • Turbine foundations, erection and wiring
  • Relay installation and settings
  • Steel erection
  • Substation
  • Underground collection
  • 5.34-mile transmission line


Location Briscoe, TX