Statistical or Overview Information
Start Date: September 2018
Completion Date: November 2019
The project consisted of the owner-supplied 77 2.72 MW, 116-meter rotor (90-meter hub height) WTGs.The project also included public road improvements maintenance, site access roads, WTG foundations, two free-standing 90-meter MET towers, an O&M building, medium-voltage collection system, fiber optic cable, collector substation, and approximately 5.4 miles of 345 kV single circuit transmission line from Crocker substation dead-end structure to the new switchyard built and owned by Basin Electric Power Cooperative.
Project Scope: | |
---|---|
|
|
Location Crocker, SD