Start Date: July 2016

Completion Date: December 2017

El Cabo Wind was a unique project with a repeat client, Avangrid, near the town of Encino, New Mexico. This project consists of 142 Gamesa 80 meter tall 2.1 MW turbines for a total of 298.2 MW. El Cabo is located on very rocky terrain and sits at a 6,100-foot elevation, which made the turbine installation a challenge for our employees. Even with its obstacles, the Wanzek team completed El Cabo on time and under budget.

Project Scope:

  • CSA for the installation of roads, foundations, turbine installation, tower wiring and mechanical completion
  • Construction of an O&M building
  • Meteorological tower installation

Location Encino, New Mexico

Client Avangrid Renewable Energy

Project Profile Download