Statistical or Overview Information
Start Date: December 2015
Completion Date: December 2016
Wanzek Construction, Inc. was contracted as the EPC contractor to construct the Frontier Windpower project. The 200 MW project utilized 61 Vestas V126 3.3 MW turbines. Frontier was the first wind farm to utilize the V126 turbine in the United States.
Project Scope:
- Civil and foundation engineering and installation
- Collection system installation
- Contracting method
- Transmission line installation
- Turbine offload and erection activities
Location Kay County, OK