Frontier

Frontier 2
sprite-7

Statistical or Overview Information

Start Date: December 2015

Completion Date: December 2016

Wanzek Construction, Inc. was contracted as the EPC contractor to construct the Frontier Windpower project. The 200 MW project utilized 61 Vestas V126 3.3 MW turbines. Frontier was the first wind farm to utilize the V126 turbine in the United States.

Project Scope:

  • Civil and Foundation Engineering and Installation
  • Collection System Installation
  • Contracting Method
  • Transmission Line Installation
  • Turbine Offload and Erection Activities

Location Kay County, OK

Client Duke Energy Sustainable Solutions