Hubbard

Hubbard Masthead_122722
sprite-7

Statistical or Overview Information

Start Date: June 2018

Completion Date: November 2019

Through changing site conditions, extreme winter weather and more, the Wanzek team successfully erected this wind farm. Hubbard was an EPC project consisting of 99 GE 2.82 MW WTGs with a 114-meter hub height and 9 GE 2.32 MW WTGs with an 80-meter hub height. The 108 WTGs combine for a total output capacity of just over 300 MW. Hubbard also executed 108 main crane break downs through the course of completion.

Location Waco, TX

Project Profile Download

sprite-4

Project Scope

Self-Perform
  • Roads
  • Foundations
  • Turbine offload
  • Erection
  • Mechanical completion
  • Tower wiring
  • Collection system
  • Terminations
Subcontractors
  • Collection system trenching
  • Meteorological tower install
  • Concrete
  • Aggregate
  • Material testing