Maryneal

Maryneal
sprite-7

Statistical or Overview Information

Start Date: September 2019

Completion Date: June 2021

The Maryneal Windpower project was Wanzek’s first project to achieve a zero punch list Nordex turbine. With Maryneal’s successes came its challenges (which Wanzek successfully worked through), such as multiple Nordex blade delays that required our team to singleblade the majority of the turbines after they were installed with a hammerhead configuration.

Project Scope:

  • Full CSA contract including full engineering, civil works, foundation construction (with 90% blasting required), collection installation in a rocky terrain, substation construction
  • Installation of 38 Ea Nordex N149 4.8 MW turbines, five-section towers with multi-part nacelles requiring assembly on the ground and tower wiring

    Location Nolan County, Texas

    Client Cass County Water Resource District