Mesteno

Mesteno Masthead_121322
sprite-7

Statistical or Overview Information

Start Date: January 2019

Completion Date: December 2019

Wanzek Construction, Inc. utilized two LR 11,000 cranes on the Mesteno project. It was the first 112-meter turbine hub height project Wanzek installed in a large-scale wind farm.

Project Scope:
  • Civil
  • Collection installation
  • Engineering
  • Foundation
  • Full BOP
  • Installation
  • Interconnect
  • Substation
  • Transmission line installation
  • Turbine offload
  • WTG foundations

Project Size:

  • 200 MW
  • 56 Vestas V136 3.6 MW, 136-meter rotor diameter, 112-meter hub height WTGs

Location Starr County, TX