Statistical or Overview Information
Start Date: January 2019
Completion Date: December 2019
Wanzek Construction, Inc. utilized two LR 11,000 cranes on the Mesteno project. It was the first 112-meter turbine hub height project Wanzek installed in a large-scale wind farm.
Project Scope: | |
---|---|
|
|
Project Size:
- 200 MW
- 56 Vestas V136 3.6 MW, 136-meter rotor diameter, 112-meter hub height WTGs
Location Starr County, TX
Project Profile Download