Statistical or Overview Information

Start Date: August 2022

Completion Date: March 2024 (Tentative)

Red Tailed Hawk Solar is Wanzek’s largest solar project to date. The project is located southwest of Houston, Texas in the city of El Campo. Once completed, the project will produce enough energy to power over 66,000 homes.

Location Wharton County, TX

Project Profile Download

sprite-4

Project Scope

Self-Perform
  • Engineering of PV, substation and transmission lines
  • Procurement of all major equipment excluding main power transformer, power stations and PV modules
  • Site grading, civil construction (including rough grading of substation area) and roads
  • Pile and single-axis tracker installation
  • MV, DC and fiber optic cable installation
  • Module installation
  • Wire management
  • Commissioning and testing of piles, racking, modules, AC/DC cabling, O&M building, substation and transmission lines
Subcontractors
  • O&M building
  • Transmission line
Inverters
  • 71 Ingeteam Power Stations
  • 350 MWac, 459.5 MWdc