Statistical or Overview Information
Start Date: June 2019
Completion Date: December 2020
Wanzek built a 50 MWac solar plant in Sanford, Maine on noncontiguous land parcels. With 450 acres of land, the Sanford project is the largest utility scale solar project on an active airfield in the United States.
- Directional boring operation
- 6 miles of AC trenching
- 1.5 miles of overhead collector installed
Location Sanford, ME
Project Profile Download
Project Scope
Construction
- Switchyard
- Substation
Design
- Civil
- Electrical
- Mechanical
PV Array
- 177,034 solar panels
- 210 acres of clearing, stumping, grubbing, grading, roads and 10 miles of fencing
Electrical Installation
- Site testing
- Commissioning and startup