Statistical or Overview Information

Start Date: March 2022

Completion Date: March 2023 (anticipated)

Skyhawk Solar is Wanzek’s second project in Tennessee. The project is located in the northwest Tennessee area in Union City, directly west of the regional airport. The site contains three parcels of land: two smaller parcels containing three inverter blocks, and one large parcel containing twenty of the total twenty-six inverter blocks. The power will be placed on TVA’s grid and will produce enough energy to power over 50,000 homes.

Project Scope:

  • Procurement of all major equipment (half of racking materials and modules provided by client)
  • Site grading
  • Civil construction (including rough grading of substation area) and roads
  • Pile installation
  • Single-axis tracker installation
  • MV cable and DC cable installation
  • Fiber optic cable installation
  • Module installation
  • Wire management
  • Commissioning and testing