Statistical or Overview Information
Start Date: July 2022
Completion Date: December 2023
Storey Solar is located in Pinal County, Arizona on a property size of 748 acres. Onsite there are 40,849 piles, 301,636 modules and 2,742 tracker rows.
Location Coolidge, AZ
Project Profile Download
Project Scope
Self-Perform
- Civil site grading (including substation and BESS pads, roads and SWPPP measures)
- Pile installation
- Tracker installation
- DC cable and grounding cable installation
- Module installation
- Wire management
- Commissioning and testing
Subcontractors
- MV cable
- Perimeter site fence
- Pile boring subcontractor
- Temporary power installation
- Third-party testing
- Thermal grouting
Inverters
- 30 Power Electronics
- 88 MWac, 169 MWdc
Be part of something big.