Twin Rivers

Twin Rivers Masthead_121222
sprite-7

Statistical or Overview Information

Started: March 2020

Completed: March 2021

This is the first of three projects in Florida awarded by the client. The project is a 75 MW site, with 20 TMEIC Ninja Inverters, 234,920 modules, 2,816 mechanical racks and 31,844 piles. The majority of the project was constructed using self-perform methodology (few subcontractors). Twin Rivers was the first EPC lump sum solar project built by Wanzek for the client.

Project Scope:

  • Site grading
  • Civil construction including rough grading of substation area
  • Roads
  • Pile installation
  • Single-axis tracker installation
  • MV and DC cable installation
  • Fiber optic cable installation
  • Module installation
  • Wire management
  • Commissioning and testing

Location Lake City, FL