New Harvest Wind Farm

Wanzek was responsible for the civil infrastructure, foundations, turbine erection, tower wiring, OM building, and SWPPP for this project. There was a total of 107,000 lf of access road that was installed, 50 foundations that consisted of 400CY of concrete each, erected and mechanically completed 50 Gamesa 2.0 WTG's, built OM building while beating all deadlines.  This was Wanzek's 6th Wind Farm collaboration with Iberdrola for a total capacity of over 550. Wanzek has become a “go to” contractor for Iberdrola Renewables, ask Iberdrola and they will tell you that Wanzek is not just a “contractor” but a member of their renewable team.