Willows Solar Project - 380kW

This 380kW solar project was started at the end of February 2011 in Willows, California. The scope of work included installing 58 dual-axis trackers with 24 PV modules mounted to each tracker. The dual-axis tracker allows for an increase in production by simply adjusting the PV to align with the sun throughout the day and seasons. The project also included support systems, cabling and inverters to build the solar facility at the Waste Water Treatment plant. The project wrapped up in May 2011. the system will provide power to the town's Waste Water Treatment plant which serves a population of over 6000 residents.